Wastewater

see also: Wastewater Equalization Basin

May 22, 2017
Resolution Authorizing Issuance and Sale of Wastewater Revenue Bonds
Agenda

May 22, 2017
Adoption of an Ordinance of the City Council of the City of Pacifica Amending Sections 6-6.404 through 6-6.408 of Chapter 6, Title 6, (Sewer Charges) of the Pacifica Municipal Code to Revise and Increase the City's Sewer Charges" (Second Reading)
Agenda

May 8, 2017
Public Hearing on Proposed Ordinance Amending Section 6-6.404 and Section 6-6.408 of the Pacifica Municipal Code (Sewer Rates) for Fiscal Years 2017/18 through 2021/22
Agenda

April 24, 2017
Approval of Consultant Agreements Between the City of Pacifica and Freyer & Laureta, Inc. for Engineering Design Services in the Amount of $132,000 and Erler & Kalinowski Inc. for Project Management Services in the Amount of $265,600 in Connection with the Collection System Rehabilitation and Replacement Project Pedro Point (C031A)
Agenda

April 24, 2017
Approval of Consultant Agreement Between the City of Pacifica and Thermal Process Systems, as a Sole Source, in the Amount of $56,577, for the Upgrading of the Autothermal Thermophilic Aerobic Digesters (ATAD) Controls and Programmable Logic Controller (PLC) System, Completing the Calera Creek Water Recycling Plant ATAD Improvement Project Phase 2 (P002)
Agenda

March 27, 2017
A Resolution of the City Council of the City of Pacifica Stating Its Intention to Revise the City’s Sewer Charges Beginning Tax Year 2017-2018
Agenda
Minutes

March 13, 2017
Approval of Consultant Agreement Between the City of Pacifica and Freyer & Laureta, Inc. in the Amount of $61,300 for Providing Civil Engineering Services to the Calera Creek Water Recycling Plant ATAD Improvement Project Phase 2 (P002)
Agenda

January 09, 2017
Approval of Consultant Agreement Between the City of Pacifica and Freyer & Laureta, Inc. in the Amount of $59,130 for Providing Civil Engineering Services to the Collection System Project FY2016-17
Agenda

December 12, 2016
Adoption of Ordinances to Adopt the 2016 Edition of California Building Standards Code with Local Amendments, Update to the Storm Water Management and Discharge Control Ordinance, and Amend Section 6-3.13.603(B) of Title 6, Chapter 13 of the Pacifica Municipal Code Related to Requirements for Sewer Lateral Compliance Certificates (Second Reading)
Agenda

November 28, 2016
Introduction of Ordinances to Adopt the 2016 Edition of California Building Standards Code with Local Amendments, Update to the Storm Water Management and Discharge Control Ordinance, and Amend Section 6-13.603(B) of Title 6, Chapter 13 of the Pacifica Municipal Code Related to Requirements for Sewer Later Compliance Certificates.
Agenda
Minutes

October 10, 2016
Approval of Consultant Services Agreement with Bartle Wells Associate for the City of Pacifica Sewer Rate Study
Agenda
Minutes

July 11, 2016
Purchase of Two Ebara Model 500DSZ3 Submersible Propeller Pumps Via Sole Source from Gierlich-Mitchell, Inc. in the Amount of $130,100.22 for the Calera Creek Water Recycling Plant.
Agenda

June 27, 2016
Resolution of the City Council of the City of Pacifica Accepting the Report of Sewer Service Charges for Fiscal Year 2016-2017 and Directing the Filing of Charges for Collection by the County Controller.
Agenda

June 13, 2016
Adoption of Resolution Authorizing the Purchase of a Vac-Con Truck from Municipal Maintenance Equipment Company
Agenda
Minutes

June 13, 2016
Contract with Larry Walker Associates, Inc. for the Calera Creek Water Recycling Plant National Pollution Discharge Elimination System Permit Renewal in an Amount Not to Exceed $100,000
Agenda

May 23, 2016
Adoption of Resolution Authorizing the Purchase of a Vac-Con Truck from Municipal Maintenance Equipment Company
Agenda

March 28, 2016
Notice of Completion for the Collection system Rehabilitation & Replacement Projects: FY 2014-2015, Phase 1
Agenda
Minutes

November 9, 2015
Approval of Contract with Citygate Associates for Interim Waste Water Director Services
Agenda

October 12, 2015
Notice of Completion for the Linda Mar Generator Replacement Project
Agenda

September 14, 2015
Revisions to Job Description and Title Change for the Classification of Wastewater Treatment Plant Assistant Superintendent (Maintenance)
Agenda

July 13, 2015
Proposed Resolution of the City Council of the City of Pacifica Accepting the Report of Sewer Service Charges for Fiscal Year 2015-2016 and Directing the Filing of Charges for Collection by the County Controller.
Agenda

March 23, 2015
Authorization to Sole Source to Gierlich-Mitchell, Inc. the Purchase of Ebara Model 500DSZ3 Submersible Propeller Pump in the Amount of $68,473.80 for the Calera Creek Water Recycling Plant.
Agenda

March 23, 2015
Award of Contract to Centrisys Corporation in the Amount of $285,580 for the Purchase of the New Centrifuge Unit, Centrisys CS18-4 2PH for the Calera Creek Water Recycling Plant
Agenda

January 26, 2015
Award of Contract to Bay Pacific Pipelines, Inc. in the Amount of $1,160,445.00 for the Collection System Rehabilitation & Replacement Projects: FY2014-15 Phase 1
Agenda
Minutes

November 24, 2014
Sale of 2014 Wastewater Refunding Bonds
Agenda

October 27, 2014
Resolution Authorizing Issuance and Sale of Wastewater Revenue Refunding Bonds
Agenda
Minutes

October 27, 2014
Advertise for Sealed Bids the Collection System Rehabilitation and Replacement Projects – FY 2014-15 Phase 1
Agenda

September 8, 2014
Wastewater 20 Year Financial Plan
Agenda
Minutes

August 11, 2014
Authorization to Advertise for Sealed Bids to Purchase a New Centrifuge Unit and Its Appurtenances for the Calera Creek Water Recycling Plant
Agenda

August 11, 2014
Authorization to Advertise for Sealed Bids the ATAD Modification Project – Phase 2
Agenda

August 11, 2014
Notice of Completion for the Collection System Rehabilitation & Replacement Projects: FY2012-13
Agenda

August 11, 2014
Notice of Completion for the Palmetto Laterals Project
Agenda

August 11, 2014
Award of Construction Contract to E R a Construction, Inc. and Approval to Retain YEI Engineers, Inc. Services for Construction Management and Inspection for the Linda Mar Generator Replacement Project
Agenda
Minutes

July 28, 2014
Public Hearing to Consider Proposed Resolution of the City Council of the City of Pacifica Accepting the Report of Sewer Service Charges for Fiscal Year 2014-2015 and Directing the Filing of Charges for Collection by the County Controller
Agenda
Minutes

June 23, 2014
Calera Creek Water Recycling Plant Fuel Tank Replacement
Agenda

April 28, 2014
Authorization to Advertise for Sealed Bids the Linda Mar Pump Station Generator Project
Agenda

March 10, 2014
Award of Contract to Ranger Pipelines, Inc. in the Amount of $99,107.00 for the Palmetto Laterals Project
Agenda

February 10, 2014
Authorization to Enter into Change Order No. 10 in the Amount of $269,551 with Ranger Pipelines, Inc. for the Collection System Rehabilitation & Replacement Projects: FY2012-13
Agenda

January 13, 2014
Approval and Authorization to Sign a Letter of Support for Assembly Bill 418 (C/CAG Stormwater Funding Legislation)
Agenda

December 9, 2013
Approval of Amendment 1 to Brown and Caldwell Agreement
Agenda

October 28, 2013
Emergency Item - Purchase of Parts for Calera Creek Recycling Plant Scrubber Fan/Blower in the Amount of $48,194.53
Minutes

October 28, 2013
Wastewater Force Mains Condition Assessment Project
Agenda
Minutes

October 14, 2013
Chemical Root Services
Agenda

September 9, 2013
Wastewater Force Main Condition Assessment Project RFP
Agenda
Minutes

July 22, 2013
Public Hearing to Consider Proposed Resolution of the City Council of the City of Pacifica Accepting the Report of Sewer Service Charges for Fiscal Year 2013-2014 and Directing the Filing of Charges for Collection by the County Controller
Agenda
Minutes

May 28, 2013
Adoption of an Ordinance Entitled "An Ordinance of the City Council of the City of Pacifica Amending Sections 6-6.404 and 6.6-406 of Chapter 6, Title 6, (Sewer Charges) of the Pacifica Municipal Code to Revise and Increase the City's Sewer Charges" Second Reading
Agenda

May 13, 2013
Award of Contract to Ranger Pipelines, Inc. in the Amount of $1,347,755.00 for the Collection System Rehabilitation & Replacement Projects: FY2012-13 [Sewer Facility Construction Fund 34, Account Nos.34.900000.52800.C023.000, 34.900000.52800.C029.000, 34.900000.52800.C031.000]
Agenda
Minutes

May 13, 2013
Public Hearing on Proposed Ordinance Amending Section 6-6.404 and Section 6-6.406 of the Pacifica Municipal Code (Sewer Rates) for FY 2013/14, FY 2014/15, FY 2015/16 and FY 2016/17
Agenda
Minutes

April 8, 2013
Storage Agreement with Pacifica Historical Society for Area at Calera Creek Water Recycling Plant
Agenda

March 11, 2013
Notice of Intent for Sewer Charges for FY 2013-2014
Agenda
Minutes

February 11, 2013
20 Year Financial Plan for Wastewater/Sewer (Funds 18 and 34)
Agenda
Minutes

February 11, 2013
Wastewater CCTV Services
Agenda

January 28, 2013
Award of Contract to ThyssenKrupp Elevator in the Amount of $39,610 to Repair and Upgrade the Calera Creek Water Recycling Plant Elevator [Sewer Facility Operation and Maintenance Fund 18, Account No. 18.940741.52400.0000.000 – Maintenance (Office Equipment)]
Agenda

January 14, 2013
Chemical Root Control Consultant Services
Agenda

January 14, 2013
Advertise for Sealed Bids the Collection System Rehabilitation and Replacement Projects – FY 2012-13 [Sewer Facility Construction Fund 34, Account No.34.900000.52800.C031.000]
Agenda

November 26, 2012
Salary Adjustment for the Position of Director of Wastewater Collections and Plant Operations
Agenda

November 13, 2012
Establish the Job Description for Operator III – Program Coordinator and Confirm Salary Range
Agenda

November 13, 2012
Salary Adjustment for the Position of Director of Wastewater Collections and Plant Operations
Agenda

November 13, 2012
Re-Certification of the Sewer System Management Plan
Agenda

September 10, 2012
Notice of Completion for the Collection System Capacity Improvement Projects: Palmetto Mainline Capacity Upgrade
Agenda

August 13, 2012
Refinancing of 2001 Bond Wastewater through a private placement issue at 3.6% rate of interest and financing for an additional $2,570,000 for a portion of the Phase 1 Sewer Collection System Master Plan
Agenda
Minutes

July 23, 2012
Public Hearing: To consider Proposed Resolution of the City Council of the City of Pacifica Accepting the Report of Sewer Service Charges for Fiscal Year 2012-2013 and Directing the Filing of Charges for Collection by the County Controller
Agenda
Minutes

July 23, 2012
Adoption of Resolution of the City Council of the City of Pacifica adopting the City of Pacifica 2012 Storm Drainage System Master Plan
Agenda

June 25, 2012
Authorization to enter into Change Order No. 1 in the amount of $45,000 with Stoloski & Gonzalez, Inc. for the Collection System Capacity Improvement Projects: Palmetto Mainline Capacity Upgrade [Sewer Facility Construction Fund 34, Account No.34.900000.52800.C032.000 - Collection System Capacity Improvement Projects.
Agenda

June 11, 2012
Authorization to purchase a new sewage pump (rotating assembly) for the Sharp Park Pump Station. (Fund 34.900000.52800.C008.000)
Agenda

June 11, 2012
Authorization to purchase a new 250 horsepower electrical motor for the Sharp Park Pump Station. (Fund 34.900000.52800.C008.000)
Agenda

May 29, 2012
Financing the First Phase of the Wastewater System Capital Improvements
Agenda
Minutes

May 29, 2012
Award of Contract to Stoloski & Gonzalez, Inc. in the amount of $305, 170.00 for the Collection System Capacity Improvement Projects: Palmetto Mainline Capacity Upgrade [Sewer Facility Construction Fund 34, Account No.34.900000.52800.C032.000- Collection System Capacity Improvement Projects]
Agenda

May 29, 2012
Adoption of "An Ordinance of the City Council of the City of Pacifica Amending Sections 6-6.404 and 6-6.406 of Chapter 6, Title 6, (Sewer Charges) of the Pacifica Municipal Code to Revise and Increase the City's Sewer Charges" second reading
Agenda

May 29, 2012
Solicit Proposals from Qualified Engineering Consultants to Provide Plans, Specifications and Estimate (PS&E) for the Linda Mar Pump Station Modification Project [Sewer Facility Construction Fund 34, Account No.34.900000.52800.C017.000]
Agenda

May 29, 2012
Advertise for Sealed Bids the Collection System Projects: Relocation of Pacific Avenue Mainline [Sewer Facility Construction Fund 34, Account No.34.900000.52800.C005.000]
Agenda

May 29, 2012
Notice of Completion for the Collection System Projects: Sanitary Sewer System Improvements at Bower Road
Agenda

May 14, 2012
Public Hearing on Proposed Ordinance Amending Section 6-6.404 and Section 6-6.406 of the Pacifica Municipal Code (Sewer Rates)
Agenda
Minutes

April 9, 2012
Authorize Staff to Advertise for Sealed Bids the Collection System Capacity Improvement Projects: Palmetto Avenue Mainline From North of Shoreview Ave to Paloma Avenue [Sewer Facility Construction Fund 34, Account No.34.900000.52800.C032.000]
Agenda

March 12, 2012
Adoption of A Resolution of the City Council of Pacifica Stating Its Intention to Revise the City's Sewer Charges Beginning Tax Year 2012-2013
Agenda
Minute

February 14, 2012
Authorization to enter into Change Order No. 5 in the amount of $78,700 with RMC Water and Environment (RMC) for the City of Pacifica Wastewater Collection System Master Plan [Sewer Facility Construction Fund 34, Accnt No.34.900000.52800.C007.000 - Sewer System Master Plan].
Agenda

February 14, 2012
Authorization to enter into Change Order No. 11 in the amount of $50,000 with Dexal Construction, Inc. for the Palmetto Slipline Project and Release the $49,587 retention for the work completed in January 2011 [Sewer Facility Construction Fund 34, Accnt No.34.900000.52800.C021.000 - Palmetto Slipline Project].
Agenda

November 28, 2011
Adoption of an Ordinance entitled "An Ordinance of the City Council of the City of Pacifica Adding Chapter 13 to Title 6 of the Pacifica Municipal Code Establishing Regulations for the Treatment, Disposal and Control of Wastewater and Industrial Wastes and Fixing Penalties for the Violation of Said Regulations; and Amending Article 8 of Chapter 10 of Title 6 of the Pacifica Municipal Code to Provide Enforcement Procedures and Remedies" second reading,
Agenda

November 14, 2011
Introduction of an Ordinance of the City Council of the City of Pacifica Adding Chapter 13 to Title 6 of the Pacifica Municipal Code Establishing Regulations for the Treatment, Disposal and Control of Wastewater and Industrial Wastes and Fixing Penalties for the Violation of Said Regulations; and Amending Article 8 of Chapter 10 of Title 6 of the Pacifica Municipal Code to Provide Enforcement Procedures and Remedies. This Ordinance will Enable the City of Pacifica to Control of the Waste Products Discharged to Our Sanitary Sewer System and Provide Means for Requiring Private Property Owners to Replace Their Sewer Laterals When They Sell or Remodel Their Homes.
Agenda
Minutes

November 14, 2011
Award of Contract to Ranger Pipeline in the amount of $164,092.00 for the Collection System Projects: Sanitary Sewer System Improvements at Bower Road [Sewer Facility Construction Fund 34, Account No. 34.900000.52800.C005.000]
Agenda

October 24, 2011
20 year Financial Plan for Implementing the Sewer Collection System Master Plan as a condition of the Settlement Agreement with Regional Water Quality Control Board
Agenda
Minutes

October 10, 2011
Purchase Lateral Launch Camera for Televising Sewer Laterals and Upgrade CCTV Software.
Agenda

September 12, 2011
Award of Contract to SFE Global in the amount of $67,562 for the Wastewater Collection System Smoke Testing FY2011-2012 [Sewer Facility Construction Fund 34, Acct No.34.900000.52800.C027.000 - Smoke Testing]
Agenda

August 8, 2011
Approval of Agreement between the City of Pacifica and San Mateo County for Stormwater Inspection and Follow up Services. No budget authority required.
Agenda

July 25, 2011
Consideration of Proposed Resolution of the City Council of the City of Pacifica Accepting the Report of Sewer Service Charges for Fiscal Year 2011-2012 and Directing the Filing of Charges for Collection by the County Controller.
Agenda
Minutes

July 25, 2011
Consideration of Approval of Contract for Performance of Supplemental Environmental Project between Pacifica's Environmental Family/Pacifica Beach Coalition, the City of Pacifica and Our Children's Earth Foundation [Sewer Facility Construction Fund 34, Acct No.34.900000.52800.C025.000 - OCE Settlement]
Agenda
Minutes

July 11, 2011
Adoption of Resolution authorizing immediate expenditure of public money to safeguard Iife, health or property and allow for the emergency repair of the Rockaway Beach Force Main and authorization of staff to enter into construction contracts for the repair for $19,000
Agenda

June 27, 2011
Rejection of all Bids for the New Centrifuge Unit and its Appurtenances for the Calera Creek Water Recycling Plant (CCWRP) and Authorization to Re-bid [Enterprise Wastewater Construction Fund: Account No. 34.900000.52800.P006.000 - Centrifuges]
Agenda
Minutes

June 13, 2011
Notice of Completion for the Collection System Projects: Sanitary Sewer Mainline Replacement at Avalon Drive and Edgemar Avenue
Agenda

May 23, 2011
Award of Contract to RedZone Robotics/ICOMMM, Inc. in the amount of $209, 770 for the City of Pacifica Wastewater Collections Asset Management Software [Sewer Facility Construction Fund 34, Acct No. 34.900000.5xxxx.C022.000 - CMMS Maintenance Software]
Agenda

May 23, 2011
Adoption of "An Ordinance of the City Council of the City of Pacifica Amending Sections 6-6.404 and 6-6.406 of Chapter 6, Title 6, (Sewer Charges) of the Pacifica Municipal Code to Revise and Increase the City's Sewer Charges" second reading
Agenda

May 09, 2011
Public Hearing on Proposed Ordinance Amending Section 6-6.404 and Section 6-6.406 of the Pacifica Municipal Code (Sewer Rates)
Agenda
Minutes

May 09, 2011
Rejection of all Bids for the New Centrifuge Unit and its Appurtenances for the Calera Creek Water Recycling Plant (CCWRP) and Authorization to Re-bid [Enterprise Wastewater Construction Fund: Account No. 34.900000.52800.P006.000 - Centrifuges]
Agenda

April 11, 2011
Authorize Staff to Advertise for Sealed Bids the Collection System Projects: Sanitary Sewer System Improvements at Bower Road [Sewer Facility Construction Fund 34, Account No.34.900000.52800.C005.000]
Agenda

March 14, 2011
Approval of Agreement between the Association of Bay Area Governments (ABAG) and the City of Pacifica to participate in the Bay Area-wide Trash Capture Demonstration Project and allow the City to receive grant funding in the amount of $30,298 for purchase and installing trash capture devices.
Agenda
Minutes

March 14, 2011
Adoption of A Resolution of the City Council of the City of Pacifica Stating Its Intention to Revise the City's Sewer Charges Beginning Tax Year 2011-2012
Agenda
Minutes

March 14, 2011
Award of Contract to RMC Water and Environment in the amount of $84,600 for the Calera Creek Water Recycling Plant (CCWRP) National Pollutant Discharge Elimination System (NPDES) Permit No. CA0038776 Renewal [Sewer Facility Construction Fund 34, Acct No.34.900000.52800.P013.000- CCWRP NPDES Permit Renewal]
Agenda
Minutes

March 14, 2011
Authorization for the City Manager to Award Contract to WECO Industries for the Purchase and Installation of a New High-Velocity Hydro-Jetting Unit for the Wastewater Division's Sewer Emergency Response Vehicle in the Amount Not to Exceed $51,515.29. [Sewer Facility Construction Fund 34, Account No. 34.900000.52800.C005.000]
Agenda

February 28, 2011
Certification of the Sanitary Sewer Management Plan (SSMP)
Agenda

February 14, 2011
Approval of Consultant Services Agreement between the City of Pacifica and Carollo Engineers for the City of Pacifica Storm Drainage Master Plan Project. No additional budget required as enough funds have been previously budgeted in Planned Local Drainage Fund, Account No.19.86000.52800.0032.000
Agenda

January 24, 2011
Approval to Solicit Proposals from Qualified Engineering and Environmental Compliance Consultants to Assist the City of Pacifica in the Renewal of its National Pollutant Discharge Elimination System (NPDES) Permit No. CA0038776 for the Calera Creek Water Recycling Plant (CCWRP)
Agenda

December 13, 2010
Authorization to enter into Change Order No. 3 in the amount of $91,800 with RMC Water and Environment (RMC) for the City of Pacifica Wastewater Collection System Master Plan [Sewer Facility Construction Fund 34, Accnt No.34.900000.52800.C007.000 - Sewer System Master Plan].
Agenda

December 13, 2010
Notice of Completion for the Collection System Projects: Sanitary Sewer Mainline Replacement at Lewis Lane
Agenda

December 13, 2010
Authorization to Advertise for Sealed Bids to Purchase a New Centrifuge Unit and Its Appurtenances for the Calera Creek Water Recycling Plant
Agenda

December 13, 2010
Award of three Three Year - Contracts to Go Native, Inc. i) for the Implementation of the Habitat Management Plan for Depressional Wetlands Areas Designed as Snake Habitat in the amount of $34,295; ii) for the management of Cape Ivy infestation in the upper section of Calera Creek in the amount of $39,000; and iii) for the invasive non-native plant control for the Calera Creek riparian corridor and immediate areas in the amount of $41,550 [Sewer Facility Construction Fund 34, Accnt No.34.900000.52800.P011.000 - Calera Creek Wetland Compliance]
Agenda
Minutes

December 13, 2010
Award of Contract to Stoloski & Gonzalez, Inc. in the amount of $101,210.00 for the Collection System Projects: Sanitary Sewer Mainline Replacement at Avalon Drive and Edgemar Avenue [Sewer Facility Construction Fund 34, Accnt No.34.900000.52800.C005.000 - Collection System]
Agenda

November 22, 2010
Establish a job description and salary range for the position of Waste Water Treatment Plant - Operator II - Source Control Inspector
Agenda

September 13, 2010
Award of Contract to Callicutt Energy Services, Inc. to purchase the Generator Set and Transfer Switch in the amount of $254,552.50 for the Linda Mar Pump Station Generator Project [Sewer Facility Construction Fund 34, Account No.34.900000.52800.C017.000]
Agenda

September 13, 2010
Authorize Staff to Advertise for Sealed Bids the Collection System Projects: Sanitary Sewer Mainline Replacement At Avalon Avenue Between Edgemar Avenue and Oceana Avenue [Sewer Facility Construction Fund 34, Account No.34.900000.52800.C005.000]
Agenda

August 9, 2010
Annual Construction Cost Index adjustment for sewer connection fees
Agenda
Minutes

August 9, 2010
Award of Contract to Dexal Construction, Inc. in the amount of $431,550.00 for the Palmetto Slipline Project [Sewer Facility Construction Fund 34, Accnt No.34.900000.52800.C021.000]
Agenda

August 9, 2010
Authorize the City Manager to Sole Source to Parson Corporation for the rebuild of the Aqua Guard® Self-Cleaning Bar/Filter Screens at the Linda Mar Pump Station for $75,788 and Sharp Park Pump Station for $74,456. Authorize additional Budget Authority of $14,200 for Account No. 34.900000.52800.COl 1.000 and $12,600 for Account No. 34.900000.52800.C012.000. [Sewer Facility Construction Fund 34, Account No. 34.900000.52800.COl 1.000, Amended Budget $89,200 and Account No. 34.900000.52800.C012.000, Amended Budget $87,600]
Agenda
Minutes

July 26, 2010
Public Hearing: To consider Proposed Resolution of the City Council of the City of Pacifica Accepting the Report of Sewer Service Charges for Fiscal Year 2010-2011 and Directing the Filing of Charges for Collection by the County Controller.
Agenda
Minutes

July 26, 2010
Notice of Completion for the Sanitary Sewer Mainline Replacement Between Talbot Avenue and Moana Way Project
Agenda

July 26, 2010
Authorize the City Manager to Sole Source to Thermal Process Systems (TPS) the Purchase of Equipment and Instrumentation Services for $217,588 for the ATAD Modification Project - Phase 2 [Sewer Facility Construction Fund 34, Acct. No. 34.900000.52800.0094.000 - Digesters]
Agenda

June 28, 2010
Award of Contract to Pacific Trenchless, Inc. in the amount of $93,228.00 [sewer facility construction fund 34] for the Collection System Projects: Sanitary Sewer Mainline Replacement at Lewis Lane
Agenda

May 24, 2010
Adoption of an Ordinance entitled "An Ordinance of the City Council of the City of Pacifica Amending Section 6-6.404 and Section 6-6.406 of Chapter 6, Title 6, (Sewer Charges) the Pacifica Municipal Code to Revise and Increase the City's Sewer Charges" Second Reading
Agenda
Minutes

May 24, 2010
Authorize Staff to Advertise for Sealed Bids to Purchase a New Generator and Its Appurtenances for the Linda Mar Pump Station
Agenda

May 10, 2010'
Authorize Staff to Advertise for Sealed Bids the Sanitary Sewer Mainline Replacement At Lewis Lane Project
Agenda

May 10, 2010
Public Hearing on Proposed Ordinance Amending Section 6-6.404 and Section 6-6.406 of the Pacifica Municipal Code (Sewer Rates)
Agenda
Minutes

April 26, 2010
Award of Contract to Darcy & Harty Construction, Inc for Sanitary Sewer Mainline Replacement Between Talbot Avenue and Moana Way Project [$111,420 sewer construction fund 34]
Agenda

April 26, 2010
Authorize the City Manager to Sole Source to Light Stream the Purchase of the Ultra Violet Light Cured Fiberglass Lining Products for the Palmetto Slip-line Project [$311,900 from sewer construction fund 34]
Agenda

March 22, 2010
Adoption of A Resolution of the City Council of the City of Pacifica Stating Its Intention to Revise the City's Sewer Charges Beginning Tax Year 2010-2011
Agenda
Minutes

March 8, 2010
Authorize Staff to Advertise for Sealed Bids the Palmetto Slip-line Project - Phase 1
Agenda

March 8, 2010
Authorize Staff to Advertise for Sealed Bids the Sanitary Sewer Mainline Replacement Between Talbot Avenue and Moana Way Project
Agenda

March 8, 2010
Notice of Completion for the Waukesha Engine Overhaul at Linda Mar Pump Station Project
Agenda

November 09, 2009
Adoption of Resolution Supporting C/CAG filing an Appeal on behalf of San Mateo County and San Mateo County cities choosing to participate in this action, and Direct the City Manager and City Attorney to inform C/CAG that the City of Pacifica may be named as a participating party in the appeal and to remain involved in this process.
Agenda

October 26, 2009
Award of Contract to RMC Water and Environment for the City of Pacifica Wastewater Collection System Master Plan
Agenda

September 28, 2009
Approval to Solicit Proposals from Qualified Vendors for the City of Pacifica Wastewater Division's Uniforms Rental and Maintenance Services
Agenda

September 28, 2009
Approval To Solicit Proposals from Qualified Consultants to Develop the City of Pacifica Wastewater Collection System Master Plan
Agenda

September 14, 2009
Approval To Solicit Proposals from Qualified Consultants to Develop the City of Pacifica Wastewater Collection System Master Plan
Agenda

July 27, 2009
Public Hearing: To consider Proposed Resolution of the City Council of the City of Pacifica Accepting the Report of Sewer Service Charges for Fiscal Year 2009-2010 and Directing the Filing of Charges for Collection by the County Controller
Agenda
Minutes

June 08, 2009
Notice of Completion for the ATAD Digester Modification Project
Agenda

May 26, 2009
Adoption of Proposed Ordinance Amending Section 6-6.404 and Section 6-6.406 of the Pacifica Municipal Code (Sewer Rates) (Second Reading)
Agenda
Minutes

May 11, 2009
Public Hearing on Proposed Ordinance Amending Section 6-6.404 and Section 6-6.406 of the Pacifica Municipal Code (Sewer Rates)
Agenda

May 11, 2009
Adopt Resolution Requesting that the San Francisco Bay Regional Water Quality Control Board revise the Draft Tentative Order for the Municipal Regional Stormwater Permit
Agenda

April 13, 2009
Notice of Completion for the 635/639 Big Bend Drive Debris Flow Barrier Project
Agenda

March 23, 2009
Review the Strategic Plan Update Goals and Objectives as of March 2009
Agenda
Minutes

March 23, 2009
Adoption of A Resolution of the City Council of the City of Pacifica Stating Its Intention to Revise the City's Sewer Charges Beginning Tax Year 2009-2010
Agenda
Minutes

March 23, 2009
Two Resolutions authorizing the City Manager to sign and file, for and on behalf of the City, a Financial Assistance Application for a financing agreement from the State Water Resources Control Board for the planning, design, and construction of the Palmetto Slip Line Project and the Linda Mar Lift Station Generator Upgrade Project.
Agenda

December 08, 2008
Notice of Completion for the Sharp Park Pump Station Solar Project (Roof Seismic Upgrade - Phase 1)
Agenda

October 27, 2008
Approval of the Construction Management Contract Agreement between the City of Pacifica and Cotton Shires and Associate for the 635/639 Big Bend Drive Debris Flow Barrier Project
Agenda

October 13, 2008
Award of Contract to Peterson Power Systems for the Waukesha Engine Overhaul at Linda Mar Pump Station Project, and Authorize Budget Authority for $75,000
Agenda

September 08, 2008
Approval of a detailed supplemental environmental project (SEP)
Agenda
Minutes

July 28, 2008
Public Hearing: To consider Proposed Resolution of the City Council of the City of Pacifica Accepting the Report of Sewer Service Charges for Fiscal Year 2008-2009 and Directing the Filing of Charges for Collection by the County Controller
Agenda

May 27, 2008
Adoption of Ordinance Amending Section 6-6.404 and Section 6-6.406 of the Pacifica Municipal Code (Sewer Rates) Second Reading
Agenda
Minutes

May 12, 2008
Public Hearing on Proposed Ordinance Amending Section 6-6.404 and Section 6-6.406 of the Pacifica Municipal Code (Sewer Rates)
Agenda
Minutes

March 24, 2008
Notice of Completion for the Monterey Road Sanitary Sewer Improvements Project
Agenda

March 24, 2008
Authorize Staff to Advertise for Request For Proposal (RFP) for Furnishing Engineering Services for the Design Retrofit and Construction Monitoring of Enaqua Ultra Violet Light Disinfection System at the Calera Creek Water Recycling Plant
Agenda

March 24, 2008
Adoption of A Resolution of the City Council of the City of Pacifica Stating Its Intention to Revise the City's Sewer Charges Beginning Tax Year 2008-2009
Agenda
Minutes

March 24, 2008
Establish a job description and salary range for the position of Director of Wastewater Collections and Plant
Agenda

March 10, 2008
Sewer Rate Process
Agenda
Minutes

February 25, 2008
Report on the process for the development and adoption of the MRP (Municipal Regional Permit; Stormwater National Pollution Discharge Elimination System Permit) which is replacing the NPDES county wide permit, approval of submission of a comment letter to the Regional Water Quality Control Board, and authorization of Mayor's participation in the upcoming Water Board hearing.
Agenda

February 11, 2008
Authorize the City Manager to enter into an Agreement with Enaqua to install a pilot UV disinfection system at the Calera Creek Water Recycling Plant in order to secure samples of disinfected effluent water for testing in furtherance of Enaqua effort to secure State of California approval for Enaqua's UV disinfection system
Agenda

January 28, 2008
Authorize Additional Budget Authority of $69,344.00 for the ATAD Digester Modification Project for the repair of the Sequencing Batch Reactor Tank No. 2 (SBR-2) at the Calera Creek Water Recycling Plant
Agenda
Minutes

November 28, 2007
SBR-2 Piping Failure-authorization to enter into purchase order with Siemens for equipment
Minutes

November 13, 2007
Approve Compromise Settlement and Mutual Release with Pump Repair Service
Agenda

October 22, 2007
Notice of Completion for the Emergency Slide Repair at Fairmont Park Sewer Access Road Project
Agenda

August 13, 2007
Notice of Completion for the 1628-DR-CA 2006 FEMA Repairs Project: Beach Blvd. Seawall, Rockaway Beach Seawall, Clarendon Outfall and Pier Piles
Agenda

July 23, 2007
Public Hearing: To consider Proposed Resolution of the City Council of the City of Pacifica Accepting the Report of Sewer Service Charges for Fiscal Year 2007-2008 and Directing the Filing of Charges for Collection by the County Controller
Agenda
Minutes

July 9, 2007
Approval of a waiver of right to hearing and agree to make payment and also to undertake a supplemental environmental project (SEP)
Agenda

June 25, 2007
UV disinfection system for the Wastewater Treatment Plant and Installation of a new Standby Generator for the Sharp Park Pump Station
Agenda
Minutes

June 11, 2007
Support for SCA 12 Storm Water and Urban Runoff (Yee and Torlarkson)
Agenda

June 11, 2007
Adoption of an Ordinance Entitled "An Ordinance of the City Council of the City of Pacifica Amending Sections 6-6.404 and 6-6.406 of Chapter 6, Title 6, (Sewer Charges) of the Pacifica Municipal Code to Revise and Increase the City's Sewer Charges" second reading
Agenda

May 29, 2007
Resolution Authorizing Short-Term Borrowing for Wastewater Treatment Plant Operations, and the Approval of a Contract of Purchase of Tax and Revenue Anticipation Notes, if Necessary, Between the City of Pacifica and Piper Jaffray (the City's underwriter)
Minutes

May 29, 2007
Sewer Fund Cash Flow
Minutes

May 29, 2007
Sewer Connection Fee Study
Minutes

May 14, 2007
Award of Contract to Power Engineering Contractors, Inc. for the ATAD Digester Modification Project for $447,000. Authorize Budget Authority of $447,000
Agenda
Minutes

April 9, 2007
Adoption of A Resolution of the City Council of the City of Pacifica Stating Its Intention to Revise the City's Sewer Charges Beginning Tax Year 2007-2008
Agenda
Minutes

April 9, 2007
Award of Contract to Bay Pacific Pipelines, Inc. for the Monterey Road Sanitary Sewer Improvements Project for $269,215. Authorize Additional Budget Authority of $216,000
Agenda
Minutes

April 9, 2007
Adoption of the ordinance titled "AN ORDINANCE OF THE CITY COUNCIL OF THE CITY OF PACIFICA, AMENDING CHAPTER 6 OF TITLE 6 OF THE PACIFICA MUNICIPAL CODE RELATING TO SEWER SERVICE CHARGES" second reading
Agenda

March 26, 2007
Introduction of the ordinance titled "AN ORDINANCE OF THE CITY COUNCIL OF THE CITY OF PACIFICA, AMENDING CHAPTER 6 OF TITLE 6 OF THE PACIFICA MUNICIPAL CODE RELATING TO SEWER SERVICE CHARGES"
Agenda
Minutes

March 26, 2007
Notice of intention to advertise a Bid for the construction portion of the Digester Modification Project
Agenda

March 26, 2007
Authorize Staff to Enter into Agreement with Thomas Reid and Associates for Calera Creek Wetlands Compliance Monitoring Report for $15,310
Agenda

February 13, 2007
Proposal from Skyfield USA for the Sharp Park Wastewater Treatment Plant Undeveloped Property
Agenda

February 13, 2007
Authorization to Enter Into Agreements with the California Office of Emergency Services/FEMA for a Hazard Mitigation Grant for the Sharp Park Pump Station and City Buildings
Agenda

September 25, 2006
Authorization to enter into a Change Order with Mark Olson Electric for costs associatedto install new disconnect switch, install new oil filled transformer, replace block building with a Hypolon building, install 6 feet of additional 4000 amp busway and 2 each, 4000 amp 90 degree elbows, install 3 e.ach of removable 4 inch pipe bollards and 10 each 4 inch fixed bollards for a total of $37,320.60
Agenda

September 11, 2006
Approve Purchase Order for the sole-source purchase of four mixing pumps with expansion boots, four foam control systems, four radar foam sensors; two heat exchangers, control cabinet with control logix PLC, panelview touchscreen, communication card, and backup battery system to reduce Digester Odor at the Wastewater Treatment Plant
Agenda

September 11, 2006
Award of bid and authorization to enter into an agreement with Technology, Engineering & Construction, Inc., the low bidder for Soil and Ground Water Quality Evaluation Services, at the former Sharp Park Wastewater Treatment Facility
Agenda

September 11, 2006
Authorize to purchase two Robicon Variable Frequency Drives with Siemens Energy & Automation, Inc. for the Sharp Park sewage pump station
Agenda

August 14, 2006
Adoption of Policy Regarding Provision of Sewer Service to Affordable Housing Developments
Agenda

July 24, 2006
Authorization for the City Manager to Enter Into Consultant Services Agreements with Questa Engineering to Update the City's Drainage Master Plan for $142,500 and Baker·Engineering to Update the City's Sewerage Master Plan for $50,000
Agenda

July 10, 2006
Public Hearing To consider Proposed Resolution of the City Council of the City of Pacifica Accepting the Report of Sewer Service Charges for Fiscal Year 2006-2007 and Directing the Filing of Charges for Collection by the County Controller
Agenda

July 10, 2006
Award of Contract to PureLine Treatment Systems to provide Chemical and Service for equipment associated with the odor control system
Agenda

June 26, 2006
Adoption of "An Ordinance of the City Council of the City of Pacifica Amending Section 6-6.404 and Section 6-6.406 of Chapter 6, Title 6, (Sewer Charges) of the Pacifica Municipal Code" second reading and Adoption of "An Ordinance of the City Council of the City of Pacifica Amending Section 6-6.404 and Section 6-6.406 of Chapter 6, Title 6, (Sewer Charges) of the Pacifica Municipal Code and Setting Forth the Urgency Therefore" second reading.
Agenda

June 12, 2006
Public Hearing on Proposed Ordinances Amending Section 6-6.404 and Section 6-6.406 of the Pacifica Municipal Code (Sewer Rates)
Agenda

June 12, 2006
Resolution Recommending that the San Mateo County Flood Control District impose the Basic and Additional Charges for Funding the Expanded Scope of Work for the 2006/2007 Countywide National Pollution Discharge Elimination System (NPDES) General Program as well as the Specific Program Charges for the City of Pacifica.
Agenda

May 8, 2006
Authorize Budget Authority for the remodel of the Sharp Park Sewer Plant Buildings located at 2212 Beach Blvd. into the New City Hall Complex for $2,000,000. Authorize City Manager to proceed with the Pre-Construction Permitting Process.
Agenda

April 24, 2006
Authorization to enter into a Change Order with PowerLight for costs associated with the Coastal Commission Permit Requirements at the Calera Creek Water Recycling Plant Photo Voltaic Project for $259,322.20 to purchase 315 Solar Panels (60 kw), Inverter and Transformer for Sharp Park $344,200 for a Total of $603,522.20
Agenda

April 24, 2006
Approval of agreement with Eisenberg, Olivieri & Associates to provide assistance to City during reissuance of the Calera Creek Water Recycling Plant NPDES permit.
Agenda

April 24, 2006
Award of Contract to Ralph Black Local Independent Contractor / Millwright to fabricate and install four digester valves and associated piping for sludge transfer system for the AT AD Digester modification Project.
Agenda

April 10, 2006
Recycling of Wastewater Sludge Agreement Extension
Agenda

March 27, 2006
Relocation of the 4000 amp Main Transformer for the Wastewater Plant 3rd Floor to the ground to Olsen Electric for $381,285
Agenda

February 14, 2006
Approve an agreement with Utility Insight for the supply of a Sewer Video Inspection System
Agenda

January 23, 2006
Accept Sole Bid and Approve an Agreement (purchase order) with Utility Insight for the Supply of a Sewer Video Inspection System
Agenda

January 23, 2006
Authorization to purchase four stainless steel six inch knife gate valves with Auma actuators for the Calera Creek Water Recycling ATAD Digester System
Agenda

January 9, 2006
Approval to Award Contract to install two new built-up roofs
Agenda

January 9, 2006
Authorization to Issue a Purchase Order to All Industrial Electric Supply for Primary Transformer for the Calera Creek Water recycling Plant for $38,564.06
Agenda